A focused project can teach something valuable even when the decision is to stop.
Choose the problem before the tool
Consider a recurring task people find difficult: preparing a draft, finding project information or following up on inquiries. The choice should come from work, not from the need to showcase a new application.
Ask where context is lost, what result users expect and who can change the journey. A problem without a responsible person may produce an interesting demonstration and go no further.
Do not confuse importance with size. A smaller scope can reveal a complete journey. Trying to solve several areas at once makes it harder to understand what worked and what needs correction.
Agree what counts as an acceptable improvement
Describe how work happens today and what must not deteriorate. Include quality, clarity and the experience of those involved. Measuring only the first draft's speed may hide later correction effort.
Define examples of a useful output and an unsuitable one. This often reveals implicit differences: what complete means, who validates a claim and how much context the next person needs.
Avoid promising a result before testing it. A pilot tests a hypothesis. A reasonable expectation is enough evidence to choose the next step, not a guaranteed transformation in advance.

Test with the people who will use it
Include people who know the process and its exceptions. A tool can seem clear to its designer while asking too much of someone using it among other responsibilities.
Observe where they ask for help, what information is missing and what they still do outside the journey. These signals distinguish a useful feature from another screen added to the workload.
Keep an alternative during evaluation. If a test fails, work should continue. Also explain which information may be used and which cases remain outside the pilot.
Close with a decision and its reasons
Compare observations with the initial criteria. If there was improvement, explain where and under which conditions. Separate fixable problems from limits that suggest not continuing.
Scaling needs responsibility, training and a sustainable experience. Revising needs a specific unanswered question. Stopping needs a record of the learning, without calling the effort a success merely for producing a demonstration.
This article's original route retains the reference to ninety days, but that duration is not a promise or mandatory method. Project size depends on context. What matters is that the team understands what changed and why continuing is worthwhile.
90 days, with decisions before scaling
This roadmap is an adaptable proposal. The days are planning windows, not a guaranteed commercial timeline.
| Window | Deliverable | Decision |
|---|---|---|
| Days 1–15 | Process, owner, and starting point | Do we have data and a priority problem? |
| Days 16–30 | Prototype, evaluation, and permissions | Does it meet minimum quality criteria? |
| Days 31–60 | Supervised pilot and error logging | Does it add value over the current process? |
| Days 61–90 | An adoption, support, and follow-up plan | Scale, correct, or stop? |
Dependencies: access, authorized data, validators, and budget. Document each phase's exit criteria before starting.
Download adoption roadmap (CSV) ↓